Does the Contractor require the Project Manager’s permission to remove Plant or Materials?
|
|
1
|
738
|
15 October 2012
|
Who issues the Defects Certificate?
|
|
1
|
738
|
15 October 2012
|
What does the Project Manager do on receiving notification of an early warning from the Contractor?
|
|
1
|
738
|
12 October 2012
|
The Contractor has terminated because the Project Manager has instructed him to stop work or all work. The instruction was not due to a default by the Employer or Contractor. What is the termination procedure?
|
|
1
|
738
|
12 October 2012
|
The Employer or Others carry out work on the Site that is not stated in the Works Information. Is this a compensation event?
|
|
1
|
738
|
10 October 2012
|
NEC ECC: Option B - a bit more information
|
|
3
|
927
|
31 July 2017
|
The Contractor has terminated because he has been released under the law from performance of the contract (R17). What is the termination procedure?
|
|
1
|
737
|
12 October 2012
|
Why are deductibles (or excesses) applied to insurance policies?
|
|
1
|
737
|
11 October 2012
|
Does the Contractor have to provide insurance cover for loss of or damage to the works, Plant and Materials?
|
|
1
|
737
|
10 October 2012
|
Is the Contractor required to correct a Defect if Option X15 is used?
|
|
1
|
1310
|
16 October 2012
|
Boundaries of the Site
|
|
3
|
926
|
17 May 2022
|
NEC ECC: Option A with Options X11 incorporated
|
|
1
|
1309
|
9 May 2020
|
NEC3 ECC: When do you issue a pay less notice to a Subcontractor under a NEC Opt B contract?
|
|
1
|
736
|
2 July 2016
|
What can the Consultant do if he disagrees with the Employer's deduction of time?
|
|
1
|
736
|
19 November 2012
|
Why would the Project Manager want to give an early warning?
|
|
1
|
735
|
12 October 2012
|
Can the Employer terminate if the Contractor has substantially failed to comply with his obligations?
|
|
1
|
735
|
12 October 2012
|
What is the minimum amount of cover or minimum level of indemnity the Contractor has to provide for loss of or damage to the works, Plant and Materials?
|
|
1
|
735
|
10 October 2012
|
ECC Main Option A and Inflation under Compensation Events
|
|
2
|
1067
|
23 April 2021
|
NEC4 ECC: Option C - Self Isolation covered under the SCC during Covid-19 period?
|
|
3
|
924
|
8 July 2020
|
Introduction of new Key Dates mid contract
|
|
1
|
413
|
17 November 2021
|
What does the length of defect correction period depend on?
|
|
1
|
734
|
15 October 2012
|
NEC4 option C and disallowing actual costs that are not substantiated
|
|
1
|
1305
|
3 September 2020
|
What does Local Centre mean in a planning context?
|
|
1
|
1305
|
29 January 2013
|
TSC3 Contract dispute
|
|
6
|
392
|
3 August 2023
|
NEC3 TSC: Could a maintenance period be included under TSC?
|
|
1
|
733
|
13 May 2015
|
Where is the required performance stated for X17?
|
|
1
|
733
|
16 October 2012
|
Can the Supervisor watch the Contractor’s tests?
|
|
1
|
733
|
14 October 2012
|
NEC ECS: Who is liable after Take Over of part of the Works?
|
|
1
|
1303
|
21 May 2020
|
NEC ECC: Zclauses - additional conditions of contract selection
|
|
1
|
732
|
18 November 2018
|
NEC3 ECC: CE Programme Assessment
|
|
1
|
732
|
7 April 2016
|
If applying disallowed costs, are the specific constaints within the WI only those detailled within the Schedule of Constraints in Appendix 1/13 - Programme?
|
|
1
|
732
|
9 October 2014
|
NEC ECC: Subcontractor timescales wrong on Accepted Programme
|
|
3
|
920
|
3 November 2017
|
NEC3 ECC: What are the best practices for mobilising to use option C?
|
|
2
|
597
|
17 December 2015
|
Where is tax which the Employer is required to pay the Contractor included?
|
|
2
|
597
|
10 October 2012
|
NEC ECC: If the EW is shown on a programme, should it be a milestone or can the Contractor show time related to EW?
|
|
1
|
1300
|
29 January 2018
|
Why might the access date be after the start date?
|
|
1
|
731
|
20 November 2012
|
Is the Contractor allowed to use the Works once termination procedures are completed?
|
|
1
|
731
|
12 October 2012
|
For what reasons may the Contractor terminate the contract?
|
|
1
|
731
|
11 October 2012
|
NEC SC: What is the difference between the defects correction period and defects access period in an NEC 4 Supply contract
|
|
3
|
918
|
22 June 2020
|
Does the Contractor’s acceptance of an insurance policy or certificate provided by the Employer change the responsibility of the Employer to provide the insurances stated in the Contract Data?
|
|
1
|
730
|
11 October 2012
|
NEC ECC: Can I insist on native electronic format of the programme
|
|
2
|
596
|
1 October 2017
|
NEC ECC: Do Labour rates in the SSOCC include the direct fee?
|
|
3
|
917
|
3 May 2019
|
Using the Term Service Contract can you please advise on the mechainsm for pricing sub contract work under Task Orders (X19)
|
|
1
|
729
|
27 October 2015
|
When does the Project Manager assess the amount of payment due?
|
|
1
|
729
|
10 October 2012
|
CDM Requirements for Non-Intrusive Site Surveys
|
|
2
|
595
|
12 December 2023
|
Claiming increased materials costs
|
|
2
|
594
|
26 July 2021
|
NEC3 ECSC: If a Contractor is aware of ambiguity between drawings within the Work Information during Tender stage but does not raise an EW until during the construction phase is he entitled to a CE?
|
|
1
|
727
|
15 August 2016
|
What might searching for a defect involve?
|
|
1
|
727
|
14 October 2012
|
NEC ECC: Removing clauses from Specification for Highway Works (MCDHW 1)
|
|
2
|
593
|
30 August 2017
|
Which are the best platforms/tools used to systemise NEC3/4 contract workflows?
|
|
1
|
726
|
31 December 2020
|