About the Planning and Architecture category
|
|
0
|
377
|
27 February 2020
|
|
Is there a simple risk assessment form available for use by surveyors undertaking surveys in domestic properties?
|
|
2
|
736
|
18 May 2020
|
|
Planning: Can a building with a COI be demolished without any planning application as to its use afterwards
|
|
1
|
624
|
9 August 2018
|
|
Do you pay VAT on a Cleud application?
|
|
1
|
770
|
19 October 2015
|
|
What is the regulation for minimum spacing of bars of a walk-on grille over a light well (domestic situation)
|
|
4
|
1755
|
7 June 2013
|
|
With regard to the existing Building Regulations, what is the most recent and applicable legislation and guidance available with regard to disabled access to a building?
|
|
1
|
708
|
15 February 2013
|
|
With regard to the existing Building Regulations, should buildings that are used for industrial or commercial purposes that also contain living accommodation be legally treated as a dwelling?
|
|
1
|
742
|
15 February 2013
|
|
With regard to Building Regulations and legislation, is there any officially improved legislation or guidance with regard to domestic heating?
|
|
1
|
750
|
15 February 2013
|
|
With regard to Building Regulations and legislation, are there any official documents that deal with the prevention of overheating caused by solar gains in summer?
|
|
1
|
15522
|
15 February 2013
|
|
With regards to the existing Building Regulations, should a block of flats be treated as a separate development irrespective of the number of blocks on the site?
|
|
1
|
725
|
15 February 2013
|
|
Which documentation deals with the procedures related to working on historic buildings?
|
|
1
|
716
|
15 February 2013
|
|
Which specific Building Regulations deal with the legal procedures related to sound insulation testing?
|
|
1
|
704
|
15 February 2013
|
|
If a person(s) who is not registered to self-certify intends to carry out any form of electrical installation, what procedure needs to be followed?
|
|
1
|
1288
|
15 February 2013
|
|
If an individual has completed some electrical work, and is unsure whether or not it falls under the remit of work that needs to be certified, what is the appropriate procedure?
|
|
1
|
1036
|
15 February 2013
|
|
With regard to the existing Building Regulations, what is stated regarding alternative escape routes with regard to fire?
|
|
1
|
685
|
15 February 2013
|
|
If a balcony or flat is provided within a building in order for people to escape from fire then are there any specific safety requirements under the existing Building Regulations?
|
|
1
|
608
|
15 February 2013
|
|
According to existing Building Regulation, where should self-closing fire doors be positioned within a building?
|
|
1
|
671
|
15 February 2013
|
|
Where can one obtain more information regarding Building Regulations with regard to electrical installation?
|
|
1
|
956
|
15 February 2013
|
|
Under the existing Building Regulations, what needs to be included within the records of the installation?
|
|
1
|
886
|
15 February 2013
|
|
Under the existing Building Regulations, do inspections and tests will have to be completed and recorded with regard to electrical installations?
|
|
1
|
782
|
15 February 2013
|
|
Is there any sort of electrical work that can be carried out by a non-competent person, and for which the local authority does not need to be contacted?
|
|
1
|
825
|
15 February 2013
|
|
Is it necessary to inform a local authority Building Control Body before carrying out electrical installation work?
|
|
1
|
879
|
15 February 2013
|
|
Are there any legal consequences to carrying out electrical work when not registered as a competent person?
|
|
1
|
1081
|
15 February 2013
|
|
What are the relevant schemes for competent persons, under which qualified electricians may register?
|
|
1
|
789
|
15 February 2013
|
|
Within the existing Building Regulation, what person(s) are entitled to self-certify an installation?
|
|
1
|
776
|
15 February 2013
|
|
What duties is a competent person responsible for with regards to electrical installation under the existing Building Regulations?
|
|
1
|
836
|
15 February 2013
|
|
With regards to the existing Building Regulations, how is a 'competent firm' that is to deal with electrical work defined?
|
|
1
|
721
|
15 February 2013
|
|
With regards to the existing Building Regulations, what types of building does Approved Document P cover?
|
|
1
|
734
|
15 February 2013
|
|
What is the procedure with regard to having electrical work undertaken in one's home that involves the addition of a new electrical circuit?
|
|
1
|
723
|
15 February 2013
|
|
What are the statutory requirements under existing Building Regulations with regard to electrical installations?
|
|
1
|
749
|
15 February 2013
|