|
About the Part C Site prep category
|
|
0
|
284
|
27 February 2020
|
|
What Building Regulations exist with regard to ground movement?
|
|
1
|
518
|
15 February 2013
|
|
Is there any legislative process or procedure related to the containment or treatment of waste?
|
|
1
|
508
|
15 February 2013
|
|
According to building regulations, when it is necessary to carry out a risk assessment for methane gas?
|
|
1
|
547
|
15 February 2013
|
|
If any substance is found which was not identified in a preliminary statement about the nature of the site, is it necessary to contact the local authority?
|
|
1
|
511
|
15 February 2013
|
|
What is the purpose of a preliminary building site assessment?
|
|
1
|
542
|
15 February 2013
|
|
With regard to a building site, when is a geotechnical and geo-environmental investigation to be considered?
|
|
1
|
444
|
15 February 2013
|
|
Are there any particular processes that should be included within the risk assessment for a building construction site?
|
|
1
|
501
|
15 February 2013
|
|
What different types of risk assessment exist with regard to building construction sites?
|
|
1
|
532
|
15 February 2013
|
|
What is involved in preparatory investigation of a potential building site?
|
|
1
|
511
|
15 February 2013
|
|
What is the best way of determining how much unsuitable material should be removed before commencing building work?
|
|
1
|
575
|
15 February 2013
|
|
If an individual wishes to engage in building work related to foundations, excavations for foundations, any damp-proof course, any concrete or other material to be laid over a site and drains or sewers, how many days’ notice needs to be given to the loca
|
|
1
|
432
|
7 February 2013
|