The documentation states that access to an alternative escape route should be via one of the following sources:
a protected stairway to an upper storey;
a landing located within a protected stairway enclosure which leads to an alternative escape route on the same storey;
a protected stairway about 7.5 metres above ground level, separated by some form of fireproof construction.