Yes, there are numerous sorts of work that do not require contact, for example:
· repairs, replacements and maintenance work;
· the installation of extra power or lighting points;
· alterations to existing circuits.
Yes, there are numerous sorts of work that do not require contact, for example:
· repairs, replacements and maintenance work;
· the installation of extra power or lighting points;
· alterations to existing circuits.