If a balcony or flat is provided within a building in order for people to escape from fire then are there any specific safety requirements under the existing Building Regulations?
Planning and Architecture
Part B Fire safety
Build_Regs_Advisors
15 February 2013 13:42
2
Approved Document K states that such structures must include guarding.
Related topics
Topic
Replies
Views
Activity
With regard to the existing Building Regulations, what is stated regarding alternative escape routes with regard to fire?
Part B Fire safety
1
681
15 February 2013
Under the existing Building Regulations, are there any requirements for drainage with regards to fire protection?
Part H Drainage
1
517
15 February 2013
With regard to the Building Act 1984, is there any provision for a fire authority to have any input with regard to Building Regulations?
Part B Fire safety
1
448
7 February 2013
If a Passive Stack Ventilator is located within a stairway or stairwell, are there any Building Regulations related to the level of ventilation it must provide?
Part F Ventilation
1
552
15 February 2013
What are the requirements in the existing Building Regulations with regard to material change of use?
General
1
458
14 February 2013