Under the terms of the existing Building Regulations, what are the responsibilities of the builder / developer of a building with regards to electrical safety?
|
|
1
|
597
|
15 February 2013
|
|
Under the terms of the existing Building Regulations, what are the responsibilities of the designer of a building with regards to electrical safety?
|
|
1
|
611
|
15 February 2013
|
|
Under the terms of the existing Building Regulations, what are the responsibilities of the owner of a building with regards to electrical safety?
|
|
1
|
587
|
15 February 2013
|
|
With regard to the Building Regulations, what is the aim of Approved Document P?
|
|
1
|
617
|
15 February 2013
|
|
Where can a building owner acquire information regarding electrical requirements?
|
|
1
|
711
|
15 February 2013
|
|
Are there any particular regulations that exist with regard to the instigation and usage of robust details?
|
|
1
|
604
|
15 February 2013
|
|
With regard to Building Regulations, how are robust details approved?
|
|
1
|
692
|
15 February 2013
|
|
With regard to Building Regulations, what is meant by the term 'robust detail?
|
|
1
|
665
|
15 February 2013
|
|
Is there a maximum amount that a local authority can charge an individual owner of a building for providing a water supply?
|
|
1
|
660
|
15 February 2013
|
|
Is it legally permissible for the owner of a building to request a water supply from a local authority?
|
|
1
|
629
|
15 February 2013
|
|
Is it ever permissible for two households to share a water supply?
|
|
1
|
625
|
15 February 2013
|
|
With regard to Building Regulations, what is meant by the term 'wholesome softened water'?
|
|
1
|
876
|
15 February 2013
|
|
How does the law legally define the term 'wholesome water'?
|
|
1
|
664
|
15 February 2013
|
|
With regards to Building Regulations, what is meant by the term 'wholesome water'?
|
|
1
|
596
|
15 February 2013
|
|
Are there any fireproofing requirements for the casing of water pipes?
|
|
1
|
494
|
15 February 2013
|
|
Do the existing Building Regulations have any requirement regarding drainage for courts, yards and passageways?
|
|
1
|
579
|
15 February 2013
|
|
Under the existing Building Regulations, are there any requirements for drainage with regards to fire protection?
|
|
1
|
517
|
15 February 2013
|
|
Is it permissible for an individual to repair an existing water closet or drain?
|
|
1
|
809
|
15 February 2013
|
|
Are there any scenarios in which an individual would not need to contact a local authority before disconnecting a drain?
|
|
1
|
552
|
15 February 2013
|
|
What can be considered legitimate reasons that the local authority will allow an individual to disconnect an existing drain?
|
|
1
|
577
|
15 February 2013
|
|
What is the procedure should an individual wish to disconnect an existing drain?
|
|
1
|
526
|
15 February 2013
|
|
Are there any Building Regulations governing the ventilation of soil pipes?
|
|
1
|
1004
|
15 February 2013
|
|
Is it legally permissible for two buildings to share drainage facilities?
|
|
1
|
582
|
15 February 2013
|
|
Is any financial support available with regard to complying with drainage requirements?
|
|
1
|
537
|
15 February 2013
|
|
Does a council have any legal authority to compel building owners to comply with Building Regulations with regard to drainage?
|
|
1
|
614
|
15 February 2013
|
|
What criteria need to be satisfied in order for a local authority to be satisfied with an individual buildings plan's drainage arrangements?
|
|
1
|
554
|
15 February 2013
|
|
What specific requirements do the existing Building Requirements have with regard to drainage?
|
|
1
|
548
|
15 February 2013
|
|
Is there any reason that a local authority might reject an individual's plan to favour an earth closet over a water closet?
|
|
1
|
545
|
15 February 2013
|
|
Is there any requirement with regard to water closets contained within the existing Building Regulations?
|
|
1
|
517
|
15 February 2013
|
|
Are there any specific requirements with regard to drainage in the existing Building Regulations?
|
|
1
|
550
|
15 February 2013
|