This is dealt with by the document BS 8300:2001, which is titled “Design of buildings and their approaches to meet the needs of disabled people – Code of Practice”.
This is dealt with by the document BS 8300:2001, which is titled “Design of buildings and their approaches to meet the needs of disabled people – Code of Practice”.