About the Part H Drainage category
|
|
0
|
311
|
27 February 2020
|
|
Do the existing Building Regulations have any requirement regarding drainage for courts, yards and passageways?
|
|
1
|
578
|
15 February 2013
|
|
Under the existing Building Regulations, are there any requirements for drainage with regards to fire protection?
|
|
1
|
517
|
15 February 2013
|
|
Is it permissible for an individual to repair an existing water closet or drain?
|
|
1
|
809
|
15 February 2013
|
|
Are there any scenarios in which an individual would not need to contact a local authority before disconnecting a drain?
|
|
1
|
551
|
15 February 2013
|
|
What can be considered legitimate reasons that the local authority will allow an individual to disconnect an existing drain?
|
|
1
|
574
|
15 February 2013
|
|
What is the procedure should an individual wish to disconnect an existing drain?
|
|
1
|
526
|
15 February 2013
|
|
Are there any Building Regulations governing the ventilation of soil pipes?
|
|
1
|
998
|
15 February 2013
|
|
Is it legally permissible for two buildings to share drainage facilities?
|
|
1
|
580
|
15 February 2013
|
|
Is any financial support available with regard to complying with drainage requirements?
|
|
1
|
535
|
15 February 2013
|
|
Does a council have any legal authority to compel building owners to comply with Building Regulations with regard to drainage?
|
|
1
|
608
|
15 February 2013
|
|
What criteria need to be satisfied in order for a local authority to be satisfied with an individual buildings plan's drainage arrangements?
|
|
1
|
554
|
15 February 2013
|
|
What specific requirements do the existing Building Requirements have with regard to drainage?
|
|
1
|
546
|
15 February 2013
|
|
Are there any specific requirements with regard to drainage in the existing Building Regulations?
|
|
1
|
545
|
15 February 2013
|
|
With regards to Building Regulations, when does a local authority consult with a sewerage undertaker when assessing a full plans application?
|
|
1
|
548
|
7 February 2013
|