BI Toolkit
BI Toolkit
ReachBack
With regards to the existing Building Regulations, should a block of flats be treated as a separate development irrespective of the number of blocks on the site?
Planning and Architecture
Part A Structure
Build_Regs_Advisors
15 February 2013 13:45
2
Yes. This is covered by Approved Document L1A of the Building Regulations 2000.
Related topics
Topic
Replies
Views
Activity
Are there any special Building Regulations with regard to mixed use developments?
Part A Structure
1
424
14 February 2013
Under the existing building regulations, what are the legal requirements for any structure during its construction?
Part A Structure
1
374
7 February 2013
Under the Building Act 1984, are buildings in Inner London considered exempt?
General
1
401
6 February 2013
With regard to Building Regulations, what is the legal definition of an ‘isolated building’?
Part A Structure
1
374
14 February 2013
Are there any types of alterations and / or extensions that are likely to be excluded from Building Regulations?
Part A Structure
1
394
7 February 2013