About the Part A Structure category
|
|
0
|
311
|
27 February 2020
|
With regard to the existing Building Regulations, should buildings that are used for industrial or commercial purposes that also contain living accommodation be legally treated as a dwelling?
|
|
1
|
699
|
15 February 2013
|
With regards to the existing Building Regulations, should a block of flats be treated as a separate development irrespective of the number of blocks on the site?
|
|
1
|
673
|
15 February 2013
|
Which documentation deals with the procedures related to working on historic buildings?
|
|
1
|
665
|
15 February 2013
|
Which specific Building Regulations deal with the legal procedures related to sound insulation testing?
|
|
1
|
664
|
15 February 2013
|
What building regulations exist with regard to the permissible level of indoor nitrogen dioxide?
|
|
1
|
470
|
15 February 2013
|
Are there any regulations regarding roof angles for non-residential buildings?
|
|
1
|
487
|
15 February 2013
|
Are there any limitations regarding the size of three storey non-residential buildings?
|
|
1
|
478
|
15 February 2013
|
Are there any limitations regarding the size of single-storey non-residential buildings?
|
|
1
|
484
|
15 February 2013
|
Which types of building can be considered 'Class 7B' structures under official classification?
|
|
1
|
525
|
15 February 2013
|
Which types of building can be considered 'Class 7A' structures under official classification?
|
|
1
|
539
|
15 February 2013
|
Which types of building can be considered 'Class 6' structures under official classification?
|
|
1
|
507
|
15 February 2013
|
Which types of building can be considered 'Class 5' structures under official classification?
|
|
1
|
566
|
15 February 2013
|
Which types of building can be considered 'Class 4' structures under official classification?
|
|
1
|
487
|
15 February 2013
|
What is the floor space limit for a storey of a building which is enclosed by structural walls on one side?
|
|
1
|
515
|
15 February 2013
|
What is the floor space limit for a storey of a building which is enclosed by structural walls on all sides?
|
|
1
|
511
|
15 February 2013
|
Should a building not easily fit into any of the seven building classes, is there any legislation dealing with its classification?
|
|
1
|
469
|
15 February 2013
|
Which types of building can be considered 'Class 3' structures under official classification?
|
|
1
|
544
|
15 February 2013
|
Which types of building can be considered 'Class 2B' structures under official classification?
|
|
1
|
1546
|
15 February 2013
|
Which types of building can be considered 'Class 2A' structures under official classification?
|
|
1
|
2247
|
15 February 2013
|
Which types of building can be considered 'Class 1' structures under official classification?
|
|
1
|
487
|
15 February 2013
|
What hazards are considered risks to buildings under the existing Building Regulations?
|
|
1
|
489
|
15 February 2013
|
Are there any particular hazards associated with foundations?
|
|
1
|
425
|
14 February 2013
|
What requirements exist with regard to building foundations?
|
|
1
|
555
|
14 February 2013
|
What are the two materials most commonly used in the construction of buildings in the contemporary world?
|
|
1
|
522
|
14 February 2013
|
Are there any other pieces of legislation overseeing construction of buildings other than the Building Regulations 2000?
|
|
1
|
439
|
14 February 2013
|
If a local authority finds out that a building is being constructed using inappropriate materials, what power(s) does it have?
|
|
1
|
508
|
14 February 2013
|
Are there any consequences to constructing a building using short-lived materials?
|
|
1
|
473
|
14 February 2013
|
Is planning permission required to make internal alterations to a shop or office?
|
|
1
|
471
|
14 February 2013
|
Is planning permission required to make internal alterations to a house?
|
|
1
|
478
|
14 February 2013
|