What is the floor space limit for a storey of a building which is enclosed by structural walls on all sides?
Planning and Architecture
Part A Structure
Build_Regs_Advisors
15 February 2013 13:04
2
The limit for such a storey is 70 square metres.
Related topics
Topic
Replies
Views
Activity
What is the floor space limit for a storey of a building which is enclosed by structural walls on one side?
Part A Structure
1
557
15 February 2013
Are there any limitations regarding the size of single-storey non-residential buildings?
Part A Structure
1
516
15 February 2013
Are there any limitations regarding the size of three storey non-residential buildings?
Part A Structure
1
505
15 February 2013
Which types of building can be considered 'Class 2A' structures under official classification?
Part A Structure
1
2528
15 February 2013
Are there any types of alterations and / or extensions that are likely to be excluded from Building Regulations?
Part A Structure
1
394
7 February 2013