The levels of indoor nitrogen oxide must not exceed the following:
288ð®g/m3 (150 ppb) – 1 hour average
l 40ð®g/m3 (20 ppb) – long-term average
The levels of indoor nitrogen oxide must not exceed the following:
288ð®g/m3 (150 ppb) – 1 hour average
l 40ð®g/m3 (20 ppb) – long-term average