Class 7A structures can be defined as any buildings that are intended for the storage of goods or materials that are not covered by Class 7B, and any non-residential building not covered by Classes 1-6.
Class 7A structures can be defined as any buildings that are intended for the storage of goods or materials that are not covered by Class 7B, and any non-residential building not covered by Classes 1-6.