The following are considered Class 1 structures:
houses not exceeding 4 storeys;
agricultural buildings;
buildings that are rarely used, as long as no part of the building is closer to another building than 1.5 times the building height.
The following are considered Class 1 structures:
houses not exceeding 4 storeys;
agricultural buildings;
buildings that are rarely used, as long as no part of the building is closer to another building than 1.5 times the building height.