BI Toolkit
BI Toolkit
ReachBack
What is the floor space limit for a storey of a building which is enclosed by structural walls on one side?
Planning and Architecture
Part A Structure
Build_Regs_Advisors
15 February 2013 13:05
2
The limit for such a storey is 36 square metres.
Related topics
Topic
Replies
Views
Activity
What is the floor space limit for a storey of a building which is enclosed by structural walls on all sides?
Part A Structure
1
559
15 February 2013
Are there any limitations regarding the size of single-storey non-residential buildings?
Part A Structure
1
524
15 February 2013
Are there any limitations regarding the size of three storey non-residential buildings?
Part A Structure
1
507
15 February 2013
Are there any types of alterations and / or extensions that are likely to be excluded from Building Regulations?
Part A Structure
1
395
7 February 2013
Is planning permission required to erect a flagpole outside one’s home?
Part A Structure
1
444
14 February 2013