Is planning permission required to replace a shop front?
|
|
1
|
420
|
14 February 2013
|
Does an individual require planning permission to replace doors within a building?
|
|
1
|
416
|
14 February 2013
|
Is planning permission required to erect a hedge?
|
|
1
|
473
|
14 February 2013
|
Does an individual require planning permission to install a swimming pool?
|
|
1
|
498
|
14 February 2013
|
Is it legally permissible to utilise an unused, adjoining sector of land in order to build a house?
|
|
1
|
439
|
14 February 2013
|
Does an individual require planning permission to construct a detached garage?
|
|
1
|
401
|
14 February 2013
|
Does an individual require planning permission in order to construct a garage extension to a house, shop or office?
|
|
1
|
415
|
14 February 2013
|
Does an individual need to apply for planning permission in order to carry out a loft conversion in a top floor flat?
|
|
1
|
364
|
14 February 2013
|
Is planning permission required to erect a flagpole outside one’s home?
|
|
1
|
408
|
14 February 2013
|
Is planning permission required to build a wind turbine at one’s home?
|
|
1
|
388
|
14 February 2013
|
Is planning permission required to install solar panels at one’s home?
|
|
1
|
430
|
14 February 2013
|
Is planning permission required to erect a satellite dish?
|
|
1
|
409
|
14 February 2013
|
If an individual demolishes a building, does planning permission for a replacement automatically follow?
|
|
1
|
388
|
14 February 2013
|
When a local authority is contacted regarding the demolition of a building, what period do they have in which to respond?
|
|
1
|
406
|
14 February 2013
|
If a local authority wishes for an owner to demolish a dangerous building, can the authority compel the owner to carry out preparatory work?
|
|
1
|
441
|
14 February 2013
|
Before commencing with a legal order to demolish a building, how much notice does the person(s) involved have to give the local authorities?
|
|
1
|
348
|
14 February 2013
|
Can an individual be legally compelled to demolish a dangerous building?
|
|
1
|
408
|
14 February 2013
|
Can a local authority legally prevent people from using or occupying a dangerous building?
|
|
1
|
390
|
14 February 2013
|
What procedures and legislation relate to ‘dangerous buildings’?
|
|
1
|
397
|
14 February 2013
|
What procedures need to be carried out before it is legally permissible to demolish a building?
|
|
1
|
393
|
14 February 2013
|
Does demolishing a building require advance planning permission?
|
|
1
|
402
|
14 February 2013
|
If an individual wishes to apply cladding to a building, does this require planning permission?
|
|
1
|
409
|
14 February 2013
|
Does an individual need to seek planning permission in order to make alterations to the construction of fireplaces, hearths or flues within a house, shop or flat?
|
|
1
|
413
|
14 February 2013
|
Does an individual need to seek planning permission in order to alter the position of a toilet, bath, or other plumbed appliance within a house, shop or flat?
|
|
1
|
395
|
14 February 2013
|
Does an individual have any requirement to apply for planning permission before carrying out external decoration, repairs and / or maintenance?
|
|
1
|
406
|
14 February 2013
|
Does an individual need to apply for planning permission to make changes to the underpinning of a building?
|
|
1
|
447
|
14 February 2013
|
Is planning permission required to make alterations to a load bearing wall?
|
|
1
|
366
|
14 February 2013
|
Is planning permission required for decoration and / or repairs to be carried out to a building?
|
|
1
|
372
|
14 February 2013
|
Under existing Building Regulations, does an individual need approval to alter the position of a heating appliance within his / her house, shop or flat?
|
|
1
|
348
|
14 February 2013
|
Is planning permission required to install central heating?
|
|
1
|
429
|
14 February 2013
|