Are there any limitations regarding the size of single-storey non-residential buildings?
Planning and Architecture
Part A Structure
Build_Regs_Advisors
15 February 2013 13:09
2
Yes, their height must not exceed 3 metres, and width must not exceed 9 metres.
Related topics
Topic
Replies
Views
Activity
Are there any limitations regarding the size of three storey non-residential buildings?
Part A Structure
1
507
15 February 2013
What is the floor space limit for a storey of a building which is enclosed by structural walls on one side?
Part A Structure
1
562
15 February 2013
What is the floor space limit for a storey of a building which is enclosed by structural walls on all sides?
Part A Structure
1
559
15 February 2013
Is planning permission required to erect a flagpole outside one’s home?
Part A Structure
1
444
14 February 2013
Which types of building can be considered 'Class 1' structures under official classification?
Part A Structure
1
582
15 February 2013