The following are considered Class 2A structures:
5 storey single occupancy houses;
hotels of 4 storeys or less;
flats, apartments and other residential buildings of 4 storeys or less;
offices of 4 storeys or less;
industrial buildings of 3 storeys or less;
retailing premises of 3 storeys or, and that have less than 2000 square metres of floor area in each storey;
single storey educational buildings;
all buildings not exceeding 2 storeys to which members of the public are admitted and which contain floor areas not exceeding 2,000 square metres within each storey.