Are there any scenarios in which an individual would not need to contact a local authority before disconnecting a drain?
Planning and Architecture
Part H Drainage
Build_Regs_Advisors
15 February 2013 13:24
2
Only if a building is to be completely demolished.
Related topics
Topic
Replies
Views
Activity
What is the procedure should an individual wish to disconnect an existing drain?
Part H Drainage
1
516
15 February 2013
What can be considered legitimate reasons that the local authority will allow an individual to disconnect an existing drain?
Part H Drainage
1
569
15 February 2013
Is it permissible for an individual to repair an existing water closet or drain?
Part H Drainage
1
799
15 February 2013
What procedures need to be carried out before it is legally permissible to demolish a building?
Part A Structure
1
429
14 February 2013
Is any financial support available with regard to complying with drainage requirements?
Part H Drainage
1
531
15 February 2013