This is defined by the existing Building Regulations thus: ‘a separating wall or floor (of concrete, masonry, timber, steel or steel-concrete composite) construction, which has been assessed and approved by Robust Details Limited’.
This is defined by the existing Building Regulations thus: ‘a separating wall or floor (of concrete, masonry, timber, steel or steel-concrete composite) construction, which has been assessed and approved by Robust Details Limited’.