Yes. Local authorities require that all such implements are properly ventilated. In addition, it is not permitted to make use of either of the following:
an existing or proposed pipe designed to carry rain water from a roof, and drainage from a sanitary convenience;
an existing pipe designed to carry surface water from a premises to act as a ventilating shaft to a drain or a sewer conveying foul water.