The local authorities take the matter of drainage very seriously, and will be concerned with the following:
	     satisfactory provision has been made for drainage;
	     cesspools, private sewers, septic tanks, drains, soil pipes, rain water pipes, spouts, sinks and other appliances have all been provided for satisfactorily;
	     all sewers connected directly to any public sewer cannot admit subsoil water;
	     cesspools, private sewers and drains do not present a public threat to health or nuisance;