Are there any fireproofing requirements for the casing of water pipes?
Planning and Architecture
Part B Fire safety
Build_Regs_Advisors
15 February 2013 13:26
2
Yes. All such constructions are required to have at least half and hours worth of fire resistance.
Related topics
Topic
Replies
Views
Activity
Under the existing Building Regulations, are there any requirements for drainage with regards to fire protection?
Part H Drainage
1
509
15 February 2013
If a balcony or flat is provided within a building in order for people to escape from fire then are there any specific safety requirements under the existing Building Regulations?
Part B Fire safety
1
604
15 February 2013
What are the statutory requirements under existing Building Regulations with regard to electrical installations?
Part P Electrical
1
741
15 February 2013
NEC ECC: As a Client, can we insist on the design change on option A to make a building fire proof?
General
1
462
12 January 2020
What guidance is available for construction of timber frame buildings?
General Construction
1
536
25 January 2013