|
What Building Regulations exist regarding the use of materials?
|
|
1
|
562
|
14 February 2013
|
|
How can owners show that they have complied with Regulation 7 of the Building Regulations 2000?
|
|
1
|
463
|
14 February 2013
|
|
When building work is being carried out, who is directly responsible for ensuring that the work Building Regulations?
|
|
1
|
510
|
14 February 2013
|
|
With regards to Buildings Regulations, what is meant by the BCB?
|
|
1
|
482
|
14 February 2013
|
|
Is planning permission required to make internal alterations to a shop or office?
|
|
1
|
527
|
14 February 2013
|
|
Is planning permission required to make internal alterations to a house?
|
|
1
|
518
|
14 February 2013
|
|
Is planning permission required to replace a shop front?
|
|
1
|
451
|
14 February 2013
|
|
Does an individual require local authority permission in order to install replacements windows within a house, shop or flat?
|
|
1
|
445
|
14 February 2013
|
|
Does an individual require planning permission to replace doors within a building?
|
|
1
|
448
|
14 February 2013
|
|
Does an individual require local authority approval to install a hot water tank within a house, shop or flat?
|
|
1
|
443
|
14 February 2013
|
|
Is planning permission required to alter the plumbing of a building?
|
|
1
|
531
|
14 February 2013
|
|
Is planning permission required to erect a hedge?
|
|
1
|
501
|
14 February 2013
|
|
Is planning permission required to construct an oil storage tank?
|
|
1
|
495
|
14 February 2013
|
|
Are there any exceptions to obtaining the approval of the highways department of the local authority in order to construct a driveway or pathway that will cross an existing thoroughfare?
|
|
1
|
471
|
14 February 2013
|
|
If an individual wishes to construct a driveway pathway and it will cross an existing thoroughfare, what provisions do I need to make?
|
|
1
|
581
|
14 February 2013
|
|
Is planning permission required to lay a new driveway or pathway?
|
|
1
|
522
|
14 February 2013
|
|
Does an individual require planning permission to install a swimming pool?
|
|
1
|
527
|
14 February 2013
|
|
Is it legally permissible to utilise an unused, adjoining sector of land in order to build a house?
|
|
1
|
468
|
14 February 2013
|
|
Does an individual require planning permission to construct a detached garage?
|
|
1
|
425
|
14 February 2013
|
|
Does an individual require planning permission in order to construct a garage extension to a house, shop or office?
|
|
1
|
445
|
14 February 2013
|
|
Does an individual need to apply for planning permission in order to carry out a loft conversion in a top floor flat?
|
|
1
|
382
|
14 February 2013
|
|
Is planning permission required to erect a flagpole outside one’s home?
|
|
1
|
441
|
14 February 2013
|
|
Is planning permission required to build a wind turbine at one’s home?
|
|
1
|
414
|
14 February 2013
|
|
Is planning permission required to install solar panels at one’s home?
|
|
1
|
474
|
14 February 2013
|
|
Is planning permission required to erect a satellite dish?
|
|
1
|
443
|
14 February 2013
|
|
If an individual that is not qualified under the government’s self-certification scheme wishes to carry out electrical work, is this legally permissible?
|
|
1
|
505
|
14 February 2013
|
|
Is it necessary for an unqualified individual to notify the local authorities when installing a new electrical circuit?
|
|
1
|
575
|
14 February 2013
|
|
Is it necessary to acquire official approval in order to change an electrical fitting?
|
|
1
|
574
|
14 February 2013
|
|
With regard to Building Regulations, what legislation covers electrical wiring?
|
|
1
|
512
|
14 February 2013
|
|
Is planning permission required for electrical work?
|
|
1
|
599
|
14 February 2013
|