|
Which types of building can be considered 'Class 2B' structures under official classification?
|
|
1
|
1782
|
15 February 2013
|
|
Which types of building can be considered 'Class 2A' structures under official classification?
|
|
1
|
2529
|
15 February 2013
|
|
Which types of building can be considered 'Class 1' structures under official classification?
|
|
1
|
575
|
15 February 2013
|
|
Is there any legislative process or procedure related to the containment or treatment of waste?
|
|
1
|
512
|
15 February 2013
|
|
With regards to removing contaminants from a building site, what measures are open to the site owner?
|
|
1
|
444
|
15 February 2013
|
|
With regards to Building Regulations, what is meant by the term 'receptors'
|
|
1
|
511
|
15 February 2013
|
|
According to building regulations, when it is necessary to carry out a risk assessment for methane gas?
|
|
1
|
548
|
15 February 2013
|
|
What hazards are considered risks to buildings under the existing Building Regulations?
|
|
1
|
534
|
15 February 2013
|
|
If any substance is found which was not identified in a preliminary statement about the nature of the site, is it necessary to contact the local authority?
|
|
1
|
514
|
15 February 2013
|
|
What is the purpose of a preliminary building site assessment?
|
|
1
|
544
|
15 February 2013
|
|
With regard to a building site, when is a geotechnical and geo-environmental investigation to be considered?
|
|
1
|
445
|
15 February 2013
|
|
Are there any particular processes that should be included within the risk assessment for a building construction site?
|
|
1
|
504
|
15 February 2013
|
|
What different types of risk assessment exist with regard to building construction sites?
|
|
1
|
534
|
15 February 2013
|
|
What is involved in preparatory investigation of a potential building site?
|
|
1
|
514
|
15 February 2013
|
|
What is the best way of determining how much unsuitable material should be removed before commencing building work?
|
|
1
|
577
|
15 February 2013
|
|
Is there any governmental guidance regarding building in an area in which Radon gas is likely to be present?
|
|
1
|
538
|
14 February 2013
|
|
Are there any parts of Britain in which the radioactive gas Radon is particularly prevalent?
|
|
1
|
505
|
14 February 2013
|
|
What is the procedure should a building site contain possible contaminants?
|
|
1
|
510
|
14 February 2013
|
|
If the removal of debris from a building site after a construction has been completed involves radioactive or otherwise contaminated materials, are any special provisions required?
|
|
1
|
447
|
14 February 2013
|
|
Are there any particular hazards associated with foundations?
|
|
1
|
467
|
14 February 2013
|
|
What requirements exist with regard to building foundations?
|
|
1
|
595
|
14 February 2013
|
|
What are the two materials most commonly used in the construction of buildings in the contemporary world?
|
|
1
|
569
|
14 February 2013
|
|
If a European building standard is to replace a British standard, how does this take place?
|
|
1
|
531
|
14 February 2013
|
|
With regards to Building Regulations, what is meant by ‘European pre-standards’?
|
|
1
|
501
|
14 February 2013
|
|
Are there any other pieces of legislation overseeing construction of buildings other than the Building Regulations 2000?
|
|
1
|
482
|
14 February 2013
|
|
What are the specific purposes that Building Regulations are aimed at?
|
|
1
|
533
|
14 February 2013
|
|
If a person(s) refuse to remove offending materials from a construction, what are the likely consequences?
|
|
1
|
494
|
14 February 2013
|
|
If a local authority finds out that a building is being constructed using inappropriate materials, what power(s) does it have?
|
|
1
|
554
|
14 February 2013
|
|
Are there any consequences to constructing a building using short-lived materials?
|
|
1
|
522
|
14 February 2013
|
|
With regard to building regulations, what is meant by the term ‘short-lived’ materials?
|
|
1
|
515
|
14 February 2013
|