Is planning permission required for electrical work?
Planning and Architecture
Part P Electrical
Build_Regs_Advisors
14 February 2013 14:07
2
Only in the case of listed buildings and those located within Conservation Areas.
Related topics
Topic
Replies
Views
Activity
Is planning permission required for decoration and / or repairs to be carried out to a building?
Part A Structure
1
410
14 February 2013
Is planning permission required to alter the plumbing of a building?
Part G Sanitation
1
536
14 February 2013
Does an individual require planning permission to replace doors within a building?
Part A Structure
1
450
14 February 2013
Does an individual need to seek planning permission to make alterations to a building if it is located within a Conservation Area?
Part L Conservation
1
476
14 February 2013
Is planning permission required to install solar panels at one’s home?
Part A Structure
1
476
14 February 2013