NEC 4 Framework Contract

Hi,

Is it possible to have an Infrastructure Conditions of Contract (ICC) used under the NEC4 ECC Framework Contract, or does some form of ECC Contract have to be used when the over arching Contract is the NEC Framework Contract?

Thanks
Michael