How is the cost of hire of Equipment under the Schedule of Cost Components calculated?
Payment is calculated by multiplying the hire rate by the time for which the Equipment is required.
How is the cost of hire of Equipment under the Schedule of Cost Components calculated?
Payment is calculated by multiplying the hire rate by the time for which the Equipment is required.