Yes, should this be the case the local authority will require the following in advance of the demolition:
to shore up any adjacent building;
to weatherproof any exposed surfaces of adjacent buildings;
to repair repair any damage caused to adjacent buildings;
to remove all rubbish from the site after demolition;
to disconnect sewers and drainage under the building;
to repair the surface of the ground disturbed by the demolition;
arrange for suitable professional person(s) to disconnect gas, water and electricity.