BI Toolkit
BI Toolkit
ReachBack
Under existing Building Regulations, does an individual need approval to alter the position of a heating appliance within his / her house, shop or flat?
Planning and Architecture
Part A Structure
Build_Regs_Advisors
14 February 2013 13:50
2
No, as long as it is installed by someone who is approved under the ‘competent person scheme’.
Related topics
Topic
Replies
Views
Activity
Does an individual require local authority approval to install a hot water tank within a house, shop or flat?
Part G Sanitation
1
436
14 February 2013
Is planning permission required to install central heating?
Part A Structure
1
457
14 February 2013
Is it necessary to acquire official approval in order to change an electrical fitting?
Part P Electrical
1
567
14 February 2013
Does an individual need to seek planning permission in order to alter the position of a toilet, bath, or other plumbed appliance within a house, shop or flat?
Part A Structure
1
425
14 February 2013
Does an individual need to seek planning permission in order to make alterations to the construction of fireplaces, hearths or flues within a house, shop or flat?
Part A Structure
1
440
14 February 2013