I have a query in connection with the calculation of People cost under a NEC3 Option A Contract;
-
Access has not been given to the Contractor by the Access Date;
-
Accepted as being a CE;
-
In relation to People costs, the SSCC says:
“Amounts calculated by multiplying each of the People Rates by the total time appropriate to
that rate spent within the Working Areas”
Although this is a NEC3 Contract the above wording has been taken from the NEC4 (SSCC).
Costs are being incurred by having the project people available while waiting for access to be provided.
How does Contractor recover its People costs incurred due to the CE if they are unable to get into the Working Area?