NEC ECC: Does the Supervisor role need to be independent to the Design consultant?

I have an NEC 4 ECC Option A contract that has a performance specification to inform Contractor design.
Does the Supervisor need to be independent of the Design Consultant (who hasn’t been novated) or can it be incorporated into same?

It can be one and the same or different. The choice is personal preference.