No. An example is for highway repairs where the loss is incurred by many companies. In these instances some contracts require a contractor to pay rent for the use of the highway in order to undertake the work. Therefore the longer the repair takes the more rent a contractor would be required to pay. It is worth considering such arrangements in instances where a genuine pre-estimate of loss cannot be made.