About the FIDIC Contracts category
|
|
0
|
362
|
27 February 2020
|
FIDIC 1999 Red Book
|
|
1
|
291
|
8 March 2023
|
FIDIC: Extension of Time for Construction work
|
|
4
|
659
|
16 July 2020
|
FIDIC: Are full standing time costs payable if a contractor was stopped from working for 40days due to an Employer's risk.
|
|
1
|
1882
|
7 July 2020
|
FIDIC: How does an advance warning work in FIDIC Red book 1999
|
|
2
|
1478
|
24 June 2020
|
FIDIC: Compensation on delayed works with difference between the effective day and commencement day?
|
|
1
|
539
|
21 April 2020
|
FIDIC: What is the clause which i want to refer for the scope change of the design and build contract ?
|
|
0
|
489
|
31 October 2019
|
FIDIC Yellow: Is it necessary to formally refer to the Clause under which you are claiming for a particular claim / delay?
|
|
1
|
415
|
16 October 2019
|
FIDIC, Yellow Book: Contractor Design related claim
|
|
0
|
434
|
13 October 2019
|
FIDIC: Admeasurement Contract Risks in FIDIC MDB 2010
|
|
1
|
1340
|
27 July 2019
|
FIDIC Red Book: works insurance
|
|
1
|
557
|
27 July 2019
|
FIDIC Yellow: Is contractor liable to do anything under IFC in FIDIC yellow book?
|
|
4
|
795
|
27 July 2019
|
FIDIC Red Book: Can the Engineer issue interim Determination under FIDIC 1999 Red Book
|
|
1
|
941
|
27 July 2019
|
FIDIC: What is the difference between "the amount certified by the Engineer" and "the amount which is actually due"
|
|
1
|
558
|
27 July 2019
|
FIDIC - Red Book: Dispute Board as a Agency - FIDIC MDB 2010
|
|
2
|
631
|
28 February 2019
|
FIDIC: Which are the mechanisms in the Silver Book to revoke a previously instructed Variation?
|
|
1
|
686
|
27 February 2019
|
FIDIC Red Book: Clause 20.1 and Determination
|
|
1
|
712
|
27 February 2019
|
FIDIC RED BOOK - CONS Contract - CONTRACTOR DESIGN WORKS
|
|
1
|
773
|
8 January 2019
|
FIDIC: 3.1 Engineer's duties and Authority
|
|
1
|
614
|
8 January 2019
|
FIDIC: Performance guarantee extension?
|
|
1
|
1258
|
3 September 2018
|
FIDIC (Red book): Contractor's entitlement to costs for the period of contractor's concurrent delays?
|
|
1
|
1562
|
11 April 2018
|
FIDIC Red Book: Entitlement of Employer's Claim
|
|
1
|
934
|
23 March 2018
|
FIDIC Red Book: Difference between lump sum contract and Fixed sum contract
|
|
1
|
5118
|
23 March 2018
|
FIDCI Red Book - Omitted Bill Item
|
|
2
|
2090
|
16 March 2018
|
Specific Clause omission by the Client Representative from the contract
|
|
2
|
716
|
6 February 2018
|
FIDIC: The Employer declare that All information relating the site, soil data and other aspects provided in the Tender Documents and Drawings and/or given by the Consultant’s staff are to be treated strictly as general information only without any warrant
|
|
2
|
615
|
13 December 2017
|
FIDIC: What are the major practical differences between yellow book and silver book?
|
|
1
|
4760
|
1 December 2017
|
FIDIC: Are safety barricades themselves considered as Temporary Works?
|
|
1
|
549
|
1 December 2017
|
FIDIC Yellow Book - Clause 13.3 is Cost used to value a variation?
|
|
1
|
1369
|
1 December 2017
|
FIDIC Red Book: Clause 14.5, what does "additional amount" signify
|
|
1
|
1610
|
22 March 2017
|