About the FIDIC Contracts category
|
|
0
|
418
|
27 February 2020
|
London Interbank Lending Rate-
|
|
0
|
12
|
9 June 2025
|
Differentiating between Plant, Materials and the Works
|
|
1
|
110
|
9 July 2024
|
FIDIC 1999 Red Book
|
|
1
|
430
|
8 March 2023
|
FIDIC: Extension of Time for Construction work
|
|
4
|
773
|
16 July 2020
|
FIDIC: Are full standing time costs payable if a contractor was stopped from working for 40days due to an Employer's risk.
|
|
1
|
2367
|
7 July 2020
|
FIDIC: How does an advance warning work in FIDIC Red book 1999
|
|
2
|
1689
|
24 June 2020
|
FIDIC: Compensation on delayed works with difference between the effective day and commencement day?
|
|
1
|
599
|
21 April 2020
|
FIDIC: What is the clause which i want to refer for the scope change of the design and build contract ?
|
|
0
|
545
|
31 October 2019
|
FIDIC Yellow: Is it necessary to formally refer to the Clause under which you are claiming for a particular claim / delay?
|
|
1
|
497
|
16 October 2019
|
FIDIC, Yellow Book: Contractor Design related claim
|
|
0
|
490
|
13 October 2019
|
FIDIC: Admeasurement Contract Risks in FIDIC MDB 2010
|
|
1
|
1435
|
27 July 2019
|
FIDIC Red Book: works insurance
|
|
1
|
604
|
27 July 2019
|
FIDIC Yellow: Is contractor liable to do anything under IFC in FIDIC yellow book?
|
|
4
|
878
|
27 July 2019
|
FIDIC Red Book: Can the Engineer issue interim Determination under FIDIC 1999 Red Book
|
|
1
|
1063
|
27 July 2019
|
FIDIC: What is the difference between "the amount certified by the Engineer" and "the amount which is actually due"
|
|
1
|
630
|
27 July 2019
|
FIDIC - Red Book: Dispute Board as a Agency - FIDIC MDB 2010
|
|
2
|
674
|
28 February 2019
|
FIDIC: Which are the mechanisms in the Silver Book to revoke a previously instructed Variation?
|
|
1
|
751
|
27 February 2019
|
FIDIC Red Book: Clause 20.1 and Determination
|
|
1
|
815
|
27 February 2019
|
FIDIC RED BOOK - CONS Contract - CONTRACTOR DESIGN WORKS
|
|
1
|
870
|
8 January 2019
|
FIDIC: 3.1 Engineer's duties and Authority
|
|
1
|
671
|
8 January 2019
|
FIDIC: Performance guarantee extension?
|
|
1
|
1397
|
3 September 2018
|
FIDIC (Red book): Contractor's entitlement to costs for the period of contractor's concurrent delays?
|
|
1
|
1769
|
11 April 2018
|
FIDIC Red Book: Entitlement of Employer's Claim
|
|
1
|
1023
|
23 March 2018
|
FIDIC Red Book: Difference between lump sum contract and Fixed sum contract
|
|
1
|
5599
|
23 March 2018
|
FIDCI Red Book - Omitted Bill Item
|
|
2
|
2336
|
16 March 2018
|
Specific Clause omission by the Client Representative from the contract
|
|
2
|
774
|
6 February 2018
|
FIDIC: The Employer declare that All information relating the site, soil data and other aspects provided in the Tender Documents and Drawings and/or given by the Consultant’s staff are to be treated strictly as general information only without any warrant
|
|
2
|
670
|
13 December 2017
|
FIDIC: What are the major practical differences between yellow book and silver book?
|
|
1
|
5124
|
1 December 2017
|
FIDIC: Are safety barricades themselves considered as Temporary Works?
|
|
1
|
605
|
1 December 2017
|