We have engaged a Contractor in a design capacity (via a consultancy agreement) to produce design documentation (drawings, specifications, model etc.).
The information has been produced by the contractor and we now wish to enter into an NEC3 contract Option C (with same contractor).
My query is, should the output of the early design works (separate agreement) be filed in the Employers Works Information or the Contractors Works Information?
The information the early works package generated is our proposed design, we just don’t know how to describe the information.