Do all of the Contractor’s liabilities have to be capped?
1 Like
No. Option X18 is flexible in that the amount for each cap on the Contractor’s liability can vary from ‘nil’ (i.e. zero liability) up to ‘unlimited’ (for matters that the Employer does not wish to cap).