BI Toolkit
BI Toolkit
ReachBack
What building regulations exist with regard to the permissible level of indoor bio-effluents?
Planning and Architecture
General
Build_Regs_Advisors
15 February 2013 13:12
2
These must not exceed 3.5 I/s per person.
Related topics
Topic
Replies
Views
Activity
What building regulations exist with regard to the permissible level of volatile organic compound?
General
1
497
15 February 2013
What building regulations exist with regard to the permissible level of indoor nitrogen dioxide?
Part A Structure
1
505
15 February 2013
What building regulations exist with regard to the permissible level of indoor carbon monoxide?
General
1
542
15 February 2013
Is there any requirement with regard to water closets contained within the existing Building Regulations?
General
1
513
15 February 2013
With regard to building regulations, how is the term ‘local person’s defined?
General
1
490
14 February 2013