The levels of indoor carbon monoxide must not exceed the following:
100mg/m3 (90ppm) – 15minute averaging time
60mg/m3 (50ppm) – 30minute averaging time
(DOH, 2004)
30mg/m3 (25 ppm) – 1 hour averaging time (DOH,
2004)
10mg/m3 (10 ppm) – 8 hours averaging time (DOH,
2004)