BI Toolkit
BI Toolkit
ReachBack
If an individual wishes to engage in building work that would allow them to have either new or wider access to an existing trunk or classified road, does this require planning permission?
Planning and Architecture
Part M Access
Build_Regs_Advisors
7 February 2013 13:53
2
Yes, the existing legislation states that such a scheme would always require planning permission.
Related topics
Topic
Replies
Views
Activity
Are there any exceptions to obtaining the approval of the highways department of the local authority in order to construct a driveway or pathway that will cross an existing thoroughfare?
Part M Access
1
470
14 February 2013
Is planning permission required to lay a new driveway or pathway?
Part M Access
1
520
14 February 2013
If an individual wishes to engage in work on their property which could potentially obstruct the view of road users, does this require an application for planning permission before building beings?
Part A Structure
1
384
7 February 2013
If an individual wishes to construct a driveway pathway and it will cross an existing thoroughfare, what provisions do I need to make?
Part M Access
1
579
14 February 2013
Is it necessary for an individual to apply for planning permission in order to build a new dwelling?
Part A Structure
1
424
14 February 2013