Does the Contractor have to provide insurance cover for loss of or damage to Equipment?

Does the Contractor have to provide insurance cover for loss of or damage to Equipment?

1 Like

Yes. Loss of or damage to Equipment is included in the Insurance Table (see Clause 84.2).