Given that the JCT 2024 Minor Works contract is based upon a lump sum, who takes the risk if the quantities or descriptions stated in the Work Schedules are incorrect (e.g. a different quantity in the Work Schedules than the quantity apparent from the contract drawings) i.e. is the Contract Sum adjusted to rectify the error in these circumstances?
Thanks