There are numerous possible constructions that would fit this definition. Most obviously it refers to the erection of a building, but can also refer to:
extending a controlled service or fitting;
altering materially an existing structure;
work carried out as a result of Schedule 6 of the Building Regulations 2000;
including material intended to insulate within a cavity wall;
anything that contributes to the underpinning of a building.