The local authority has the right to order the owner / occupier to:
carry out certain required repairs.
demolish all or part of the structure and arrange for any material or waste arising from this to be disposed of.
The local authority has the right to order the owner / occupier to:
carry out certain required repairs.
demolish all or part of the structure and arrange for any material or waste arising from this to be disposed of.