A scaffold has collapsed do I need to report this?
|
|
1
|
513
|
14 January 2013
|
A self-employed subcontractor sustains an over 7 day injury on a construction site, who should report it?
|
|
1
|
628
|
14 January 2013
|
During the construction of a concrete wall, the timber structure built to contain the wet concrete and reinforcement during the concrete pour collapses. There are no injuries. Is this reportable?
|
|
1
|
531
|
14 January 2013
|
RIDDOR talks about "Construction work", what does this mean?
|
|
1
|
573
|
14 January 2013
|
A child, under the supervision of their parent, falls from play equipment in a Local Authority maintained children’s play area, breaking their arm
|
|
1
|
542
|
14 January 2013
|
A visitor to a national park trips and falls on naturally occurring rocks whilst hill climbing, breaking their arm
|
|
1
|
513
|
14 January 2013
|
A visitor to a formal garden of a stately home trips and falls on gardening debris left on a path, spraining their ankle
|
|
1
|
498
|
14 January 2013
|
A member of the public banged their head on the ride when it stopped unexpectedly. They looked OK but went off to hospital for a check up anyway
|
|
1
|
531
|
14 January 2013
|
An employee steps out of his private car in the office car park. In doing so, he somehow twists his ankle. As a result he has more than 7 days off work. The employee had not yet started work for the day. There were no defects to the car park surface, debr
|
|
1
|
469
|
14 January 2013
|
Are sporting injuries reportable?
|
|
1
|
542
|
14 January 2013
|
A customer is accidentally scalded while being served hot soup by staff and is taken to hospital for treatment
|
|
1
|
589
|
14 January 2013
|
A customer knocks their soup bowl off the table while reaching for a wine glass - they sustain minor burns
|
|
1
|
444
|
14 January 2013
|
What are the health risks from asbestos?
|
|
1
|
635
|
14 January 2013
|
Where can I get hold of HSE publications about asbestos?
|
|
1
|
561
|
14 January 2013
|
A barman is attacked by a member of the public when the barman requested the customer to leave as the bar was closing
|
|
1
|
431
|
14 January 2013
|
What is the 'duty to manage' asbestos and who has it?
|
|
1
|
586
|
14 January 2013
|
What is an asbestos survey and do I need one?
|
|
1
|
597
|
14 January 2013
|
What is the control limit?
|
|
1
|
785
|
14 January 2013
|
When is an asbestos licence required?
|
|
1
|
720
|
14 January 2013
|
What about asbestos removal?
|
|
1
|
709
|
14 January 2013
|
Where can I find a licensed asbestos contractor?
|
|
1
|
671
|
14 January 2013
|
Is asbestos training a legal responsibility?
|
|
1
|
636
|
14 January 2013
|
I may have been inadvertently exposed to asbestos. What should I do?
|
|
1
|
1016
|
14 January 2013
|
When does inadvertent exposure to asbestos constitute a reportable incident under RIDDOR?
|
|
1
|
3194
|
14 January 2013
|
How should I dispose of asbestos waste?
|
|
1
|
720
|
14 January 2013
|
What changed in the asbestos regulations in 2012?
|
|
1
|
653
|
14 January 2013
|
What is notifiable non-licensed work (NNLW)?
|
|
1
|
655
|
14 January 2013
|
Does my work with asbestos insulating board (AIB) need a licence or is it notifiable non-licensed work?
|
|
1
|
43094
|
14 January 2013
|
How do I notify notifiable non-licensed work?
|
|
1
|
1758
|
14 January 2013
|
Why do the requirements in the 2012 regulations for medical surveillance for notifiable non-licensed work have a 3-year transition period?
|
|
1
|
595
|
14 January 2013
|