How do I notify notifiable non-licensed work?
To determine whether the work you are doing is classified as notifiable non-licensed work (NNLW), check the NNLW information.
Once you have confirmed the work is NNLW, you need to notify it to the relevant enforcing authority. Do this online, via a computer or Smartphone, at the [online notifications form](https://extranet.hse.gov.uk/lfserver/external/asbnnlw1). All three possible enforcing authorities can be notified via this route. This is the only method of notification - you can't notify by phone or post;
Notice should be given before the work starts - there is no minimum notice period. You do not need to wait for permission to permission from the enforcing authority - the database will provide a PDF copy of your notification. If you are a licensed asbestos contractor carrying out NNLW work, you will still need to notify.