A child, under the supervision of their parent, falls from play equipment in a Local Authority maintained children’s play area, breaking their arm.
No. If the equipment was in good working order and free of defects. An accident would generally be reportable if it was caused by: faulty or poorly maintained equipment; a failure of staff to supervise play activities properly (when it was being carried out under their charge), or a failure of health and safety management systems.