Do I need a rescue plan when working at height?
|
|
1
|
561
|
25 January 2013
|
Are ladders banned?
|
|
1
|
676
|
25 January 2013
|
Do I have to tie my ladder?
|
|
1
|
669
|
25 January 2013
|
What is the maximum height a ladder can be used?
|
|
1
|
661
|
25 January 2013
|
How often should a scaffold be inspected?
|
|
1
|
971
|
25 January 2013
|
Who is allowed to carry out a scaffold inspection?
|
|
1
|
566
|
25 January 2013
|
Must I use scafftags?
|
|
1
|
582
|
25 January 2013
|
How high should the guardrails on a scaffold be?
|
|
1
|
1351
|
25 January 2013
|
Do I have to use advanced guardrails when putting up a scaffold?
|
|
1
|
533
|
25 January 2013
|
How can I prevent falls while putting up scaffolding?
|
|
1
|
528
|
25 January 2013
|
Do I need a design drawing for my scaffold?
|
|
1
|
660
|
25 January 2013
|
What training is required to be a scaffolder?
|
|
1
|
528
|
25 January 2013
|
How often should a harness be inspected?
|
|
1
|
617
|
25 January 2013
|
What training is required to put up a tower scaffold?
|
|
1
|
526
|
25 January 2013
|
What is the maximum height a tower scaffold can be erected to?
|
|
1
|
726
|
25 January 2013
|
Can I use a roof ladder for roof repair work?
|
|
1
|
492
|
25 January 2013
|
Can I work on a fragile roof?
|
|
1
|
505
|
25 January 2013
|
Is there a wind speed above which roofing work should stop?
|
|
1
|
3408
|
25 January 2013
|
Who has duties for fire safety on a construction project?
|
|
1
|
502
|
25 January 2013
|
How do I prevent a fire on my construction site?
|
|
1
|
432
|
25 January 2013
|
What are fire hazards on a construction site?
|
|
1
|
568
|
25 January 2013
|
Who should carry out a fire risk assessment?
|
|
1
|
472
|
25 January 2013
|
What is needed in the event of a fire?
|
|
1
|
494
|
25 January 2013
|
What guidance is available for construction of timber frame buildings?
|
|
1
|
505
|
25 January 2013
|
What is a fixed alarm system?
|
|
1
|
547
|
25 January 2013
|
How many fire extinguishers do I need?
|
|
1
|
498
|
25 January 2013
|
Can I let people sleep in a building under construction?
|
|
1
|
629
|
25 January 2013
|
Is it okay to demolish a building by setting fire to it?
|
|
1
|
472
|
25 January 2013
|
What is a quick hitch?
|
|
1
|
540
|
25 January 2013
|
Are all quick hitches safe?
|
|
1
|
506
|
25 January 2013
|