You can prevent falls during the erection of a scaffold in a number of different ways, including, the use of advanced guardrails, special tools and equipment or safe methods of work. The National Access and Scaffolding Confederation (NASC) document SG4 gives details of the different methods that can be used to prevent falls when erecting, altering and dismantling scaffolding.
For further information go to the [National Access and Scaffolding Confederation website ](http://www.nasc.org.uk/).