Ladders have to be prevented from slipping during use. The options for securing a ladder are as follows:
tie the ladder to a suitable point making sure both stiles are tied;
where this is not practicable, use a ladder stability device;
if this is not possible then securely wedge the ladder e.g. against a wall;
if none of the above are possible then foot the ladder. Footing is the last resort and should be avoided where possible by the use of other methods.